and no = 35

LAPSTONE (GEO-Environment.co.ltd)

LAPSTONE

  • HS Code
  • Certification
  • Patent
  • Awards
  • Features
    This construction method introduces the technical theory of the acupressure type support method in the ground anchor method, and the structure is a product that attaches an anchor to the back of a natural stone with an adhesive and attaches a pressure plate to the end of the anchor, and this product is steeply inclined to the river bank. It is a construction method that integrates the product and the filling material by filling it with the filling material in the back while stacking it. It is a solid and nature-friendly construction method that does not use concrete.

    View more

Product details

 

Company Information

GEO-Environment.co.ltd

Address : 41-22, Burim-ro 170beon-gil, Dongan-gu, Anyang-si, Gyeonggi-do, Korea

Website : http://http://www.environ2000.co.kr/

GeoEnvironment (CEO Lee Jun-hee, www.environ2000.co.uk) will participate in the 2020 Korea Construction Safety Fair in Ilsan Kintex from Wednesday, October 28 to Friday, October 30.