and no = 14

Synchronous Lifting System with Limiting Lateral Displacement of Bridge superstructure (WOOKYUNG E&C CO.,LTD)

Synchronous Lifting System with Limiting Lateral Displacement of Bridge superstructure

  • HS Code
  • Certification
  • Patent
  • Awards
  • Features
    This method allows to lift or lower superstructure simultaneously by computer control
    This system, controllable error range within maximum ±0.5mm, allows uniform lifting by computerized displacement measurement and hydraulic control when changing bearing pad and increasing cross section at coping part of piers. (cross-section area of flow to be secured)

    View more

Product details

01. What is CLS computerized bridge lifting method ?

- This method allows to lift or lower superstructure simultaneously by computer control
 This system, controllable error range within maximum ±0.5mm, allows uniform lifting by computerized displacement measurement and hydraulic control when changing bearing pad and increasing cross

 section at coping part of piers. (cross-section area of flow to be secured)

 

02. Characteristic of CLS computerized bridge lifting method
- Minimized uneven lifting of structure by real time interlocking of height sensors and hydraulic jacks.
- Max.1.6km and max.120 pieces of hydraulic jacks are controllable.
- Load weight distribution of structures is analyzable.
- Plenty of construction experience with this method.

 

03. Equipment of CLS computerized bridge lifting method
- The company maintains nation’s largest bridge lifting equipment
- The company maintains nation’s largest hydraulic jack (160,000 ton)

 

04. Displacement control device

- When superstructure is being lifted, displacement control device will prevent the structure from moving by unexpected external force which will enable vertical lifting without error

 

 

Company Information

WOOKYUNG E&C CO.,LTD

Address : 6F, World-Beater Bldg., 13 Jeongja-ro, Bundang-gu, Seongnam-si, Gyeonggi-do, Republic of Korea

Website : http://http : //www.wkcos.com

Wookyung was founded in 1999 as a civil construction firm. At the moment, the major emphasis of work performed was bridge repair and maintenance work.
In the early 2000's, the company became involved in electrical and architectural work, and rapidly became a specialized bridge builder through constant technical research and development.
Now, on the basis of excellent workmanship and cutting edge technology, Wookyung has achieved 100% ales expansion every year since taking first step in the construction field.